内射国产内射夫妻免费频道,护士奶头又白又大又好摸视频,久久精品无码专区免费东京热,亚洲人成无码网站,色婷婷精品综合久久狠狠,每日手机在线观看av,五月婷婷丁香综合,欧美国产视频
Language |

Application

Application

LONG INTERRUPTIONS

  The first point to make is that long interruptions by all major definitions are treated completely separately; that is, outside the context of PQ as defined here. This is because long interruptions are currently referred to as continuity of supply and not as poor PQ. The main reason for this is that the causes of lack of continuity of power supply mainly originate from the energy sector, i.e. power generation, transmission and distribution. What oftenhappens is that more mitigation of continuity of supply very often results in an increase in voltage dips, which, as will be seen later, generate some of the most troublesome poor PQ cost consequences. The reason for this is simple: to minimize the quantity and duration of these interruptions, utilities apply auto-reclosing techniques, which in turn result in increased number of voltage dips. The same thing happens when electric energy end users increase their power supply redundancy levels by connecting up to additional power lines. If no additional design measures are installed when doing this, the effect is usually an increase in the cost of voltage dips.

  The costs of interruptions can be stated as the cost per event of a specific duration (most often 1 second, 1 minute, 1 hour, 4 hours, etc.). For comparisons and estimates these unit costs are usually specified by the following indices:

  ? The cost per peak power (based on maximum power demand).

  ? The cost per interrupted power (at the moment of the event).

  ? The cost per energy not supplied (level referred to the moment when an outage started or cost per peak energy not supplied when the cost is divided by the energy consumption at yearly peak demand level).

  ? The cost per energy consumption annually.

  ? The combination of both in one formula, i.e. the relative power cost plus relative energy cost.

  Some examples are:

  ? The IEEE 493 [7] standard gives averages for assessing the cost of a single interruption of 1 h duration:

  – Industrial plants: 643 $/kW+911 $/kWh.

  – Commercial facilities: 21.77 $/kWh not delivered.

  – Office buildings containing computers: $25.07 per peak kWh not delivered.

  ? The CEIDS/EPRI study found that the average cost of a 1 h outage to industrial and digital economy companies was $7795. A 3 min outage cost $2107. A 1 s outage cost $1477. For continuous process manufacturing, the outage costs were $12 654, $18 476, $14 746 for a 1 s, 3 min and 1 h outage respectively. For fabrication and essential services, the outage costs were below the continuous process manufacturing costs. Total average annual cost in the USA for zero-voltage events was $23 318.

  ? The breakdown of outage cost components for three of these groups of companies is presented in Table 18.2.

  Table 18.2 Outage cost components [9] (Reproduced from Report of Primen for Electric Power Research Institute, Consortium for Electric Infrastructure to Support a Digital Society)


Novtium(Beijing) Electric Co.,LtdAll Rights Reserved Jing ICP 14036551
主站蜘蛛池模板: 国内嫩模私拍精品视频| 中文精品久久久久人妻| 亚洲国产五月综合网| 丰满少妇高潮惨叫久久久| 国产精品无码免费视频二三区| 麻豆av久久无码精品九九| 亚瑟国产精品久久| 亚洲αⅴ无码乱码在线观看性色| 精品国产天堂综合一区在线| 成年无码一区视频| 国产免费啪嗒啪嗒视频看看| 亚洲精品成人久久电影网| 中文无码日韩欧免费视频app| 婷婷五月日韩av永久免费| 国产精品三级av三级av三级| 动漫人妻无码精品专区综合网| 国语自产视频在线| 男人的天堂在线无码观看视频 | 欧洲精品不卡1卡2卡三卡| 99精品电影一区二区免费看| 日韩人妻无码一区二区三区久久| 神马影院午夜dy888| 精品国产三级a∨在线观看| 成人免费无码精品国产电影 | 日韩精品无码专区免费视频| 亚洲中文字幕无码中文| 国内精品久久人妻无码妲己| 亚洲日本一区二区三区在线播放| 人妻人人看人妻人人添| 日本不卡在线视频二区三区| 免费做a爰片久久毛片a片下载| 亚洲综合色区另类av| 亚洲欧美熟妇自拍色综合图片| 亚洲熟女av乱码在线观看漫画| 国产在线精品国偷产拍| 四虎成人国产精品永久在线| 免费观看亚洲人成网站| 中国人与黑人牲交free欧美| 人妻熟女一区二区aⅴ清水理纱 | 亚洲偷偷自拍高清| 国产成人午夜福利在线视频|