LONG INTERRUPTIONS

  The first point to make is that long interruptions by all major definitions are treated completely separately; that is, outside the context of PQ as defined here. This is because long interruptions are currently referred to as continuity of supply and not as poor PQ. The main reason for this is that the causes of lack of continuity of power supply mainly originate from the energy sector, i.e. power generation, transmission and distribution. What oftenhappens is that more mitigation of continuity of supply very often results in an increase in voltage dips, which, as will be seen later, generate some of the most troublesome poor PQ cost consequences. The reason for this is simple: to minimize the quantity and duration of these interruptions, utilities apply auto-reclosing techniques, which in turn result in increased number of voltage dips. The same thing happens when electric energy end users increase their power supply redundancy levels by connecting up to additional power lines. If no additional design measures are installed when doing this, the effect is usually an increase in the cost of voltage dips.

  The costs of interruptions can be stated as the cost per event of a specific duration (most often 1 second, 1 minute, 1 hour, 4 hours, etc.). For comparisons and estimates these unit costs are usually specified by the following indices:

  ? The cost per peak power (based on maximum power demand).

  ? The cost per interrupted power (at the moment of the event).

  ? The cost per energy not supplied (level referred to the moment when an outage started or cost per peak energy not supplied when the cost is divided by the energy consumption at yearly peak demand level).

  ? The cost per energy consumption annually.

  ? The combination of both in one formula, i.e. the relative power cost plus relative energy cost.

  Some examples are:

  ? The IEEE 493 [7] standard gives averages for assessing the cost of a single interruption of 1 h duration:

  – Industrial plants: 643 $/kW+911 $/kWh.

  – Commercial facilities: 21.77 $/kWh not delivered.

  – Office buildings containing computers: $25.07 per peak kWh not delivered.

  ? The CEIDS/EPRI study found that the average cost of a 1 h outage to industrial and digital economy companies was $7795. A 3 min outage cost $2107. A 1 s outage cost $1477. For continuous process manufacturing, the outage costs were $12 654, $18 476, $14 746 for a 1 s, 3 min and 1 h outage respectively. For fabrication and essential services, the outage costs were below the continuous process manufacturing costs. Total average annual cost in the USA for zero-voltage events was $23 318.

  ? The breakdown of outage cost components for three of these groups of companies is presented in Table 18.2.

  Table 18.2 Outage cost components [9] (Reproduced from Report of Primen for Electric Power Research Institute, Consortium for Electric Infrastructure to Support a Digital Society)


Novtium(Beijing) Electric Co.,LtdAll Rights Reserved Jing ICP 14036551
主站蜘蛛池模板: 性夜久久一区国产9人妻| 久久精品熟女亚州av麻豆| 国产亚洲精品97在线视频一 | 国产精品美女被遭强扒开双腿| 亚洲区欧美日韩综合| 国产成人综合久久二区| 国产av高清无亚洲| 国产亚洲精品a在线| 在线看片免费人成视频在线影院| 秋霞人妻无码中文字幕| 精品一区二区无码av| 97精品久久天干天天| 国产精品无码a∨精品影院app| 久久婷婷激情综合色综合俺也去| 久章草在线无码视频观看| 欧洲国产在线精品三区| 国产成人欧美视频在线观看| 久久久国产精品va麻豆| 国产普通话对白刺激| 日韩精品一区二区av在线| 亚洲国产日韩欧美高清片| 久久综合色之久久综合| 久久久综合九色综合| 日韩欧美成人免费观看| 18禁勿入午夜网站入口| 高清有码国产一区二区| 亚洲综合精品第一页| 亚洲欲色欲香天天综合网| 一本一道色欲综合网| 亚洲性夜色噜噜噜在线观看不卡| 无码国产精品一区二区免费久久| 人与人性恔配视频免费| 精品国产成人av在线| av天堂精品久久久久2| 97影院理论片手机在线观看| 国产精品成人嫩草影院| 色一情一伦一区二区三| 亚洲日韩av无码美腿丝袜| 欧美506070老妇乱子伦| 国产在线精品无码不卡手机免费| 亚洲色大成网站www久久九|